As part of our selection process, you’re about to embark on a test designed to assess your skills and knowledge relevant to the role you’re applying for. Below are some important details to help you understand the test structure and what’s expected:
- Passing Score: To successfully pass this test, you’ll need to answer at least 70% of the questions correctly. This threshold has been set to ensure that candidates meet the high standards required for the position.
- Test Duration: You will have 20 minutes to complete the assessment. This time limit has been carefully considered to allow you sufficient time to thoughtfully respond to each question.
Please Note:
- Once you start the test, the timer will begin, and you must complete the test within the allotted time.
- Answers will be automatically submitted when the time expires.
The results of this test will be sent directly to the recruiter coordinating this hiring process. Rest assured, regardless of the outcome, this is but one step in our comprehensive evaluation process designed to identify candidates who are most likely to thrive in our organisation.
We wish you the best of luck and encourage you to approach this test with confidence and honesty.
Start Assessment
Results
Congratulations! We are pleased to inform you that you have passed the test.
You have successfully completed the aptitude test. Your performance demonstrates the skills and knowledge necessary for the challenges of offshore mining operations.
We look forward to potentially welcoming you to our team and will be in contact with you.
Thank you for taking the aptitude test.
Unfortunately, based on your performance, we regret to inform you that you have not passed the test.
We appreciate your interest in joining our team, and we encourage you to continue honing your skills and knowledge in this field.
#1. What is a PVT on a mud system?
#2. When there is a complete black out, what is not the probable cause?
#3. If the engine is running and the generator is not exiting, what is your primary check?
#4. What is the zone rating within 3 meters from the well head?
#5. What is the primary function of an SCR or VFD system on a drilling rig?
#6. What is the maximum cut off set point of the electric pump on an accumulator unit (Koomey)?
#7. When the link tilts do not work on a top drive, what is the probable cause?
#8. When considering the top drive, what does zone management mean?
#9. What kind of signal does a pit volume sensor transmits?
#10. What is the purpose of the dynamic brake on the Drawworks?