As part of our selection process, you’re about to embark on a test designed to assess your skills and knowledge relevant to the role you’re applying for. Below are some important details to help you understand the test structure and what’s expected:
Passing Score: To successfully pass this test, you’ll need to answer at least 70% of the questions correctly. This threshold has been set to ensure that candidates meet the high standards required for the position.
Test Duration: You will have 20 minutes to complete the assessment. This time limit has been carefully considered to allow you sufficient time to thoughtfully respond to each question.
Please Note:
Once you start the test, the timer will begin, and you must complete the test within the allotted time.
Answers will be automatically submitted when the time expires.
The results of this test will be sent directly to the recruiter coordinating this hiring process. Rest assured, regardless of the outcome, this is but one step in our comprehensive evaluation process designed to identify candidates who are most likely to thrive in our organisation.
We wish you the best of luck and encourage you to approach this test with confidence and honesty.
Start Assessment
Results
Congratulations! We are pleased to inform you that you have passed the test.
You have successfully completed the aptitude test. Your performance demonstrates the skills and knowledge necessary for the challenges of offshore mining operations.
We look forward to potentially welcoming you to our team and will be in contact with you.
Thank you for taking the aptitude test.
Unfortunately, based on your performance, we regret to inform you that you have not passed the test.
We appreciate your interest in joining our team, and we encourage you to continue honing your skills and knowledge in this field.
#1. What are KPI’s and how do they improve operations?
#2. What is an ERP or Safety Response Plan and what information should you be able to find on the document?
#3. What are the zones for DROPPED Objects?
#4. What can happen to a Drill pipe thread connection if the Manufacturers torque specs are not achieved when making up?
#5. What is the number one cause of fatality in the workplace?
#6. There are many situations which can cause of well bore influx (kick). Which one is not a cause of kick?
#7. When conducting a pressure test on the BOP, surface lines, choke Safety valve and the inside BOP, how should pressure be applied to ensure a competent test is completed as per API standard?
#8. When setting up pipe racks at the catwalk, what checks should be made before pipe is set on them?
#9. When completing an integrity test of the formation after drilling out the casing shoe, what is the difference between a FIT test (formation integrity test) and a LOT test (leak-off test)?
#10. What are two parameters affecting hydrostatic pressure calculation?
Submit
Submit
This website uses cookies and may ask for your personal data to enhance your browsing experience.